.png)
Back in early November 2024, the Tri-State Rigging crew loaded up and headed down to Osceola, Arkansas, teaming up with STG Solar on a major solar facility project. This job wasn’t your everyday lift-and-go. It took planning, precision, and a whole lot of sweat from everyone involved.
From day one, our team rolled up ready to work. With strategic account management, detailed CAD lift planning, and a crew that’s as skilled as they are hardworking, we were able to tackle every challenge that came our way. STG Solar has been a top-notch customer to partner with, and the trust we’re building together is what keeps projects like this running strong.
This facility shaped up to be one impressive piece of solar infrastructure, and we’re proud to have played a role in bringing it to life. The teamwork, the long days, and the smart planning all pushed this one to the next level.
When good people and good planning come together, big things happen, and this project was proof of that.
Here’s to the next challenge. We’re ready for it.